WT MAINTENANCE SCHEDULE

RECOMMENDED MAINTENANCE SCHEDULE

 The table shown below illustrates the main elements of a maintenance schedule for the proper control of a cooling water system.  Those items which are essential for the prevention of the multiplication and spread of legionnella are in the shaded area.

NB.  Before work begins:
1.         Ensure that pumps, fans etc. are electrically isolated.
2.         If the tower has been closed down or if it has not been the subject of a regular maintenance programme, then refer to the Cleaning and Disinfection section in the Tower Maintenance Guide (available from F&R Products).

Description of Service

Start Up

Weekly

Monthly

Every Six Months

Shut-down

Annually

Inspect general condition of unit

l

l

 

 

l

 

Clean debris from unit

l

 

l

 

l

 

Inspect sump – clean and flush if required

l

 

 

l

 

 

Clean sump strainer

l

 

l

 

 

 

Check and adjust sump water level and make-up

l

 

l

 

 

 

Inspect heat transfer section for fouling

l

 

l

 

 

 

Inspect water distribution

l

 

l

 

 

 

Check drift eliminators

l

l

 

 

 

 

Check water quality against guidelines

l

l

 

 

 

 

Check chemical feed equipment

l

l

 

 

 

 

Check and adjust bleed rate

l

l

 

 

 

 

Check pan heaters and accessories

 

 

l

 

 

 

Drain pump and piping

 

 

 

 

l

 

Inspect protective finish

 

 

 

 

 

l

Check fans for rotation without obstruction

l

 

 

 

 

 

Check fan and pump motors for proper rotation

l

 

 

 

 

 

Check unit for unusual noise/vibration

l

l

 

 

 

 

Check motor(s) voltage and current

l

 

 

l

 

 

Lubricate fan shaft bearings

l

 

 

l

l

 

Check and service fan drive system

l

 

l

 

 

 

Clean sump drift, packing

 

 

 

l